Updated 26th January 2018
Who
|
objective (in order of priority for each person)
|
Due Date
|
Todor
|
- Simulate active filter operation by insering it into SMH42 simulation
- Check Optical Interface Module solution through consultations with CCE
- Schematic update
- Optimize active filter design through analytical calculation
- Polary switch follow-up
- Prototype test plan with Stéphane
|
1 Feb
1 Feb
1 Feb
1 Feb
1 Feb
29 Jan
|
Julien
|
- Check GBF to control SMH16 active filter using selected modulator crate
- Test StateControl card to start charging via charger's analog interface
- Make sure SateControl card is programed and test all 5+4 outputs
- Check Optical Interface Module solution, consult CCE and Todor
|
1 Feb
1 Feb
1 Feb
1 Feb
|
Stéphane
|
- Update full converter schematic
- Propose differential voltage measurement circuit (Miguel Bastos to be involved for the design)
- Draft global converter integration design
- Report status on MCPM and MCBM mounting
- Prototype test plan with Todor
|
1 Feb
1 Feb
1 Feb
1 Feb
29 Jan
|
Davide
|
- Send AD functional spec for pre-revision to AD and SLM
|
1 Feb
|