MarXDisCap Open actions
Updated 26th January 2018
Who | objective (in order of priority for each person) | Due Date |
|---|
Todor | - Simulate active filter operation by insering it into SMH42 simulation
- Check Optical Interface Module solution through consultations with CCE
- Schematic update
- Optimize active filter design through analytical calculation
- Polary switch follow-up
- Prototype test plan with Stéphane
| 1 Feb 1 Feb 1 Feb 1 Feb 1 Feb 29 Jan |
Julien | - Check GBF to control SMH16 active filter using selected modulator crate
- Test StateControl card to start charging via charger’s analog interface
- Make sure SateControl card is programed and test all 5+4 outputs
- Check Optical Interface Module solution, consult CCE and Todor
| 1 Feb 1 Feb 1 Feb 1 Feb |
Stéphane | - Update full converter schematic
- Propose differential voltage measurement circuit (Miguel Bastos to be involved for the design)
- Draft global converter integration design
- Report status on MCPM and MCBM mounting
- Prototype test plan with Todor
| 1 Feb 1 Feb 1 Feb 1 Feb 29 Jan |
Davide | - Send AD functional spec for pre-revision to AD and SLM
| 1 Feb |